Some posers for the new rail ministry
Election
results are expected in less than a week, heralding the arrival of a new
government. While speculation and mixed chatter abound, there is a prevailing
sense of the inevitability that the current government is likely to retain
power, albeit with a reduced majority. I do not have an ear to the ground but regardless,
a new government will mean a new railway minister. If the current government is
re-elected, will there be a change in the minister for Indian Railways? Rumors
suggest that the present minister might be promoted to an even more significant
role. We wait and watch with interest.
Before
the new railway minister takes office, let us briefly review the successes and
failures of the current administration. I will focus on presenting the facts
without delving into their implications. Although I usually offer constructive
criticism and even face troll and backlash, this time I will simply lay out the
facts for readers to form their own opinions.
Let us start with this
which covers the whole gamut of the roads ahead for IR:
https://youtu.be/mQymTaDcRr4?si=ccwkAS7ScN0oBkbe
It
starts with the cliched but equally customary declaration that the railways
were merely a cash cow for politicians until 2014 and that it is important to acknowledge
the sector has since been nurtured with unprecedented investment, increasing
from ₹35,000 crore to approximately ₹2.6 lakh crore. This shift is both true
and commendable, especially considering that railways are three times cheaper
and ten times cleaner compared to road transport. However, should we not expect
some benefits in terms of an increased modal share for IR ten years after this
significant push? It acknowledges that with the country’s
economy growing at 7 to 8% with nominal growth at 11 to 12%, the additional
cargo is in the range of 3000 mt per year. (it is actually around 500 mt) It is followed by a homily on why it
was important for rail’s share to increase to save more than a lakh cr. with
much less environmental impairment. And what has happened? IR has not been able
to take over additional cargo of even 100 mt in 23-24 and the modal share is
not even flat but has perhaps dropped below 27%.
Railway
transport is indeed cheaper and faster, but the lack of integration of cargo
origins and destinations with the rail network remains a significant issue. To
address this, the Gati Shakti initiative with its multi-modal terminal policy
was announced in 2021, setting ambitious goals of establishing 160 terminals,
out of which more than 60 have already been commissioned. The initiative aims
for IR to achieve nearly a 50% modal share, reducing the country's logistics
cost to around 8%. However, progress has been very slow. According to plans, we
should have transported 2400 million tonnes (mt) by rail in 23-24 to meet the
target of 3000 mt by 2027, but we are currently just below 1600 mt.
The
Dedicated Freight Corridors (DFCs) were envisioned as the solution to
significantly enhance IR's freight transport capacity. While over 200 trains
now operate on DFCs, this is less than 50% of the intended capacity. The
Eastern DFC, spanning 1,337 km from Son Nagar to Ludhiana, has improved transit
times for coal moving from the eastern mines to northern power plants. However,
the planned extension to Dankuni remains unaddressed and therefore the corridor
would remain sub-optimum. Similarly, the 1,506 km Western DFC from Dadri to
Mumbai has reduced EXIM traffic transit time by nearly 50%, with a notable
increase in capacity due to double-stack container operations. Nonetheless, the
connection to JNPT port is not expected to be operational until late next year. We have been
hearing of completion of DFCs in terms of percentages for years now; when will
we hear 100% finished. Nobody is even asking for the RoI of the project as it
is going to be abysmal but should the project not be completed fast with more
involved project execution to realize full benefit?
IR’s
progress in electrification of tracks follows. IR has positioned India as a
global leader with nearly 100% of its rail network electrified. This milestone
is commendable on one plane as it reduces dependence on fossil fuels but at the
same time, however, has this progress outpaced necessity, leaving approximately
5,000 diesel locomotives, valued at around ₹30,000 crore, idle or
under-utilized? There has been some speculative enthusiasm about exporting
these locomotives, but this overlooks several key points. Our neighboring
countries with Broad Gauge (BG) tracks could potentially absorb no more than
100 locomotives over the next five years, assuming they even agree to purchase
used locomotives. Furthermore, economically advanced BG countries like
Argentina, Brazil, and Chile are unlikely to opt for second-hand locomotives.
Additionally, have the savings from such extensive electrification, to my knowledge,
have not been transparently reported. Is it not time to quantify them?
The
issue of public-private partnerships (PPP) and the increased role of private
players in the rail sector seems to have been dismissed due to the complexities
involved in railway construction and operations. Does this mean initiatives
such as PPPs in station modernization, private operation of premium trains, and
the expansion of private freight train operators beyond container transport are
being sidelined? Has the corporatization, let alone privatization, of rolling
stock manufacture—a part of the government's 100-day plan in 2019—been
abandoned? These questions point to a need for more strategic
planning and transparency in the execution of these ambitious projects to
ensure that the benefits are fully realized and resources are optimally
utilized.
Remember the euphoria, including my own at the
beginning of the year, over completion of the dream project to connect Kashmir
with Kanyakumari in 2024! Rightly so as
it would have a huge impact on integration of the valley with the rest of the
country. Will the technical challenge at Tunnel 1 near Katra further delay the
project considerably, going well into 2025?
After decades of hype
surrounding the redevelopment of railway stations, with tangible results seen
only in Gandhinagar and Habibgunj, we are now introduced to the Amrit Bharat
Station Scheme, which aims to transform 550 stations across IR. The critical
question remains: Will these stations be functionally efficient alongside their
glitzy facades and embellishments? Key factors include easy entry and exit,
smooth boarding and deboarding processes, controlled access to platforms,
effective passenger information systems (PIS), and maintaining hygienic
conditions. Although substantial funds are being allocated, and it is still
early days as aside from Ayodhya, we have yet to witness the completion of any
of these projects. It seems we need to adopt a wait-and-see approach.
IR’s safety record
has generally improved despite a spate of accidents with a large number of
fatalities in 2023. It is now crucial to prioritize modern initiatives to
enhance safety further. One significant development is Kavach, an indigenous
comprehensive signaling system designed to improve both capacity and safety.
However, its deployment has been sluggish. Additionally, the use of artificial
intelligence (AI) to analyze and generate meaningful alerts from the extensive
data related to train operations—such as station data loggers, axle counters,
and the advanced microprocessors on locomotives and trains—remains grossly underutilized.
This vast repository of information is currently used primarily for limited
departmental purposes. Engaging a competent agency to develop AI-enabled
algorithms not only for quick post-mortem analysis but for real-time alert
generation could substantially enhance monitoring and foster a culture of
safety consciousness. The question remains: When will we see a genuine push in
these critical areas?
The list of concerns is extensive, so for the sake of brevity, I will touch upon only a few of other key issues: 1) Track Upgradation: There is an urgent need to upgrade tracks on major trunk routes to support speeds of 160 km/h, allowing modern trains to reach their full potential. 2) Eliminating Waiting Lists: Despite the avowed plan to eliminate waiting lists for passenger travel by 2027, the reality is that General and Sleeper Classes are becoming increasingly overcrowded as the number of such coaches has inexplicably decreased. 3) Comfortable Travel for Lower Classes: Does IR aim to make travel more dignified and reasonably comfortable for its lowest classes during Amrit Kaal, potentially by transitioning to all-AC trains? 4) Maintenance Systems: There should be a shift towards less labor-intensive and more accurate maintenance systems, particularly for tracks. 5) Export Strategy: Developing a strategy for exporting rolling stock to medium-income countries is also crucial and 6) rethink of the failed IRMS experiment for induction of executives. So, where do we stand on these issues?
Last but not the least, the area of special
interest to me. Vande Bharat and its various versions. While many Vande Bharat
trains boast of high occupancy, some do not and should not have been deployed
at all. IR must carefully assess the potential patronage before introducing
these trains on new routes. I have consistently emphasized that after a certain
number of day-trains, typically around 45 or 50, IR might face challenges in
deploying these trains effectively and profitably unless a sleeper version is
introduced to replace Rajdhanis and other fast overnight trains. A case in
point is more ten ready rakes of these trains await deployment for months; is
it because of the model code for elections or because IR is unable to determine
profitable routes? A well-managed Vande Bharat Rajdhani could be a game-changer
for IR. Furthermore, as average speeds increase across IR, Vande Bharat trains
could transform travel between Delhi and major cities like Mumbai and Kolkata
into true overnight journeys, posing a significant challenge to airlines and
reshaping the competitive landscape of the transportation sector. However, the
sleeper version is unlikely to be deployed commercially in 2024.
The question arises: Why has the ICF team, which designed, developed and delivered the Train 18 in 18 months, starting from scratch, not been able to
make a much simpler modification to a sleeper version in nearly six years
since the prototype was introduced? This delay is glaring and puzzling; it warrants a thorough review to ensure that IR can fully capitalize on the
potential of Vande Bharat trains.
I recognize that asking questions is easy, while providing answers and solutions is a much more challenging. However, those who bear the mantle of responsibility must also shoulder the obligation to respond and act. Genuine action carries far more weight and significance than mere promises. To quote the bard, who speaks through Volumnia in Coriolanus: “Action is eloquence, and the eyes of the ignorant more learned than the ears.” I sincerely hope that our countrymen are not left to assume that action has actually been replaced by eloquence. True eloquence emerges from meaningful, tangible actions on the ground, not from words on paper or endless presentations to the media.
...
Scholarly article! Your dedication to the cause of making Indian Railways world class is exemplary!
ReplyDeleteThanks a lot sir
DeleteExcellent, measured and scholarly as always. Action is eloquence indeed, and one hopes that a successor in the ministry will be inclined towards underpromising and overdelivering rather than overpromising and underdelivering.
ReplyDeleteWell said, thanks
DeleteSir, why is management at ICF and IR is not incentivized to innovate?
ReplyDelete